Work cycle: complete testing of the stator (see H5/NCP); if it is positive, bonding is possible, therefore the dielectric strength and SURGE are tested again to check whether any problems have arisen.
Stopping of the bonding operation in the event of abnormal heating curves due to the effect of any breaks in the wire or short circuits between coils.
- Possibility to have 1 to 3 current generators according to the number of windings and the possibility to place them in series or in parallel.
- Operating with 1 or 2 alternate stations with 4 terminals.
Complete work cycle: about 30” on 1 or 2 alternate workplaces: 60 or 120 stators/hour.
TESTING:
- OHMIC RESISTANCE
- DIELECTRIC STRENGTH
- SURGE
- ROTATION TEST
- BONDING
OPTIONS:
- Stamping machine for good parts
- Forced cooling system, where necessary.